Most Auckland homes pay somewhere between $90 and $250+ per square metre installed for a full roof replacement, depending on the material. Long-run Colorsteel steel sits at the lower-to-mid end of that range, concrete and clay tile typically cost more due to extra material and structural requirements, and the exact figure for your home depends on roof size, pitch, access and the condition of what's coming off. Below we break down pricing by material, when you'll need council consent, and how long the job actually takes.
Roof Replacement Cost by Material
These are general installed-cost ranges per square metre, including tear-off of the old roof. Every property is different, so treat these as a starting point for budgeting, not a quote.
| Material | Approx. cost per m² (installed) | Notes |
|---|---|---|
| Long-run Colorsteel steel | $90–$180 | The most popular re-roof choice — lightweight, fast to install, long manufacturer warranties. |
| Concrete tile | $130–$220 | Heavier than steel — may need a structural check on older framing. |
| Clay / terracotta tile | $160–$260 | Premium, heritage-style look; heaviest common option, higher material cost. |
| Asphalt shingle | $100–$190 | Mid-range cost, wide style and colour choice. |
| Decramastic → steel conversion | Similar to steel re-roof range | Add asbestos testing (and removal, if needed) as a separate line item — see our Decramastic guide. |
Repair or Replace?
Isolated problems on a roof that's otherwise in good shape are usually worth repairing. Multiple recurring issues, or a roof at or past its expected lifespan, usually point to replacement being the better long-term value. For the full list of warning signs to look for on your own roof, see our guide on when to replace your roof.
Do You Need Building Consent?
In most cases, a genuine like-for-like re-roof — same material, same roof structure, no added weight — is exempt from building consent in New Zealand. Where consent is usually required is when you change the roofing material (for example, converting from tile to steel, or Decramastic to concrete tile), alter the roof structure, or add significant weight to the frame.
Exemption rules have specific conditions and exceptions that can catch people out, so this isn't something to assume either way. Always confirm the requirements for your specific project with your local council or a Licensed Building Practitioner before work starts. A reputable roofing contractor will usually flag upfront whether your project needs consent, as part of the quoting process.
How Long Does a Re-Roof Take?
For an average home, a full re-roof typically takes a matter of days once work starts — weather is the biggest variable, since roofing work largely stops in heavy rain. Larger homes, steeper or more complex roof shapes, and any structural repairs discovered once the old roofing comes off can extend the timeline.
What's Included in the Price
A re-roof quote should typically include tear-off and disposal of the old roofing, new underlay, flashings, and the roofing material and installation itself. What's usually not included, and worth asking about upfront: any structural timber repairs discovered once the old roof is off, and scaffolding costs on multi-storey homes or roofs with difficult access.
Get an Accurate Quote
Every roof is different, and the only way to get a genuinely accurate price is a site visit. We'll assess your roof, confirm whether your project needs consent, and give you a clear, itemised quote.
Call us on 022 196 9021 or fill out our quote form and we'll be in touch within 24 hours.
Roof Replacement FAQ
Most Auckland homes pay somewhere between $90 and $250+ per square metre installed, depending on the material. Long-run Colorsteel steel sits at the lower-to-mid end around $90-$180/m², while concrete tile, clay tile and other heavier materials typically cost more due to extra material and structural requirements. The only way to get an exact figure is a site visit, since roof size, pitch, access and the condition of the existing roof all affect the final price.
Usually not if it's a genuine like-for-like replacement — same material, same roof structure, no added weight. Consent is usually required if you change the roofing material, alter the roof structure, or add significant weight. Exemption rules have specific conditions and exceptions, so always confirm with your local council or a Licensed Building Practitioner before starting work.
Typically a matter of days for an average home, though this depends heavily on weather, roof size and complexity. Larger or more complicated roofs, or jobs that uncover structural repairs once the old roofing is off, can take longer.
It depends on how widespread the problem is and the age of the roof. Isolated issues on a roof that's otherwise in good condition are usually worth repairing. Multiple recurring problems, or a roof at or past its expected lifespan, usually point to replacement being the better long-term value. See our full guide on the warning signs it's time to replace your roof for a detailed breakdown.
Ready to Compare Roof Replacement Options?
Get a free, no-obligation quote from OneRoofing. We service all of Auckland, from the North Shore to South Auckland.